User Tools

Site Tools


skill-tree:k:5:e

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
skill-tree:k:5:e [2020/07/19 19:46] lucyskill-tree:k:5:e [Unknown date] (current) – removed - external edit (Unknown date) 127.0.0.1
Line 1: Line 1:
-# K5-E Modeling Costs 
-# Background 
-# Aim 
-# Outcomes 
-  * Discuss how to assess the costs for the infrastructure of data and computing centers as well as their personnel costs. 
-  * Explain economic and business aspects, e.g., break-even considerations, when personnel costs for tuning a parallel program and savings through speedups achieved are compared. 
  
skill-tree/k/5/e.1595180804.txt.gz · Last modified: 2020/07/19 19:46 by lucy