skill-tree:k:4:i
**This is an old revision of the document!**
Table of Contents
K4-I Job Scheduling
Background
Aim
Outcomes
- advanced scheduling principles (e.g. backfilling) to achieve objectives like minimizing the averaged elapsed program runtimes, and maximizing the utilization of the available HPC resources
Subskills
skill-tree/k/4/i.1559440807.txt.gz · Last modified: 2019/06/02 04:00 by 127.0.0.1