skill-tree:k:4:i
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
skill-tree:k:4:i [2020/07/19 19:45] – lucy | skill-tree:k:4:i [Unknown date] (current) – removed - external edit (Unknown date) 127.0.0.1 | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | # K4-I Job Scheduling | ||
- | # Background | ||
- | # Aim | ||
- | # Outcomes | ||
- | * Apply advanced scheduling principles (e.g. backfilling) to achieve objectives like minimizing the averaged elapsed program runtimes, and maximizing the utilization of the available HPC resources. | ||
- | # Subskills | ||
- | * [[skill-tree: |
skill-tree/k/4/i.1595180732.txt.gz · Last modified: 2020/07/19 19:45 by lucy